 Author project - captain and engineer - oceanology many years as a captain of large trawlers in the remote areas of the oceans. The project was developed eight years (from 2001 to 2008). 

   In the southern parts of the Pacific and Atlantic oceans outside the economic zones of foreign states are huge, hundreds of millions of tons of bio-reserves - Pacific jack mackerel and red Antarctic krill. 

   During the Soviet period, there were fishermen USSR intensive fishing with grant support from the State dobyvaya each year over a million tonnes of fish. In the early nineties, the fleet departed from there, because the technical characteristics of the old fleet is not allowed to conduct a profitable business. 

   Presented project proposes the construction of a new generation of ships with the latest innovative technologies. The new fleet will have the following characteristics: 

- Profitability (at the price of oil ~ 110 USD. Per barrel) - not less than 100%; 

- Cost of fuel per unit of output - not more than 0.155 kg / kg.ryby; 
(v. 0.25 - 0.30 in the best foreign samples, and 1.0 from our existing fleet of old); 

- To catch fisherman, not less than 750t (at 350 - 400t in the best foreign samples); 

- Labor productivity - not less than ten-fold increase compared with the existing old ships, and not less than two-fold compared with the best world analogues; 

- C / o of the low-wage category sailors 2kl. --Not less than 5 thousand U.S. per month (with max. ~ 3 thousand U.S. per month. In the leading foreign companies); 

-the cost of 1kg scad n / d, taking into account the delivery of Kaliningrad - not more than EUR 9; 

-the cost of horse mackerel fillets 1 kg, taking into account the delivery of Kaliningrad - not more than 17 rubles. 

   The project is given a detailed feasibility study of the above characteristics, technical characteristics of vessels and infrastructure, the time frame given for design and construction. 

  Necessary for the implementation of the project funds account for 5.5 billion USD, payback period - 3 years from the date of commissioning.
 
 